Kirchland® EcoTerm filling-and-bonding mix

EcoTerm filling-and-bonding mix

EcoTerm mix is used for bonding mineral wool or EPS boards using the "wet-on-wet" method for facade insulation of brick, concrete, aerated concrete, limestone, etc. buildings, and for forming the reinforcing layer of the insulation system. EcoTerm has increased resistance to weathering.

Technical data

CompositionPolymer-cement mix with mineral fillers and additives.
Mortar consumptionfor installing EPS or mineral wool boards - 3-5 kg per 1 m²; for the protective reinforcing layer - 3-4 kg per 1 m².
Mix ratio4.5-5.5 L of water per 25 kg of dry mix.
Pot life of the mixed mortarat least 2 hours.
Correction timeat least 20-25 min.
Substrate temperature+5°C to +30°C
Service temperature-50°C to +70°C
Frost resistance, not less than50 cycles.
Adhesion (bond strength), MPaat least 1 MPa.
StorageIn the manufacturer's sealed original packaging, in dry rooms on wooden pallets, 12 months from the production date indicated on the packaging.
PackagingBag, 25 kg.

Application

Mix the dry compound with clean water (temperature +15°C to +20°C) at a ratio of 0.18-0.22 L of water per 1 kg of dry mix and stir until a smooth, lump-free mass is obtained using a drill and mixing paddle. Let the mortar rest for 5 minutes, then stir again. The mortar can be used for at least 2 hours.

Bonding mineral wool boards

The mortar is applied over the whole area of the board with a 10x10 mm notched trowel. After applying the mortar, the board must be placed immediately in its designed position and pressed in. Pressure should be enough that 40% of the mortar spreads between the substrate and the board. Boards must be bonded edge-to-edge, flush in one plane, in a staggered pattern, avoiding aligned vertical joints. Joint width should not exceed 2 mm. Remove mortar residue with water before it sets.

The bonding method for EPS boards is chosen depending on the condition of the facade surface:

Full-surface — wall surface irregularities up to 3 mm: the mortar is applied over the whole surface of the board with a 10x10 mm notched trowel. After applying the mortar, the board must be placed immediately in its designed position and pressed in. Pressure should be enough that 40% of the mortar spreads between the substrate and the board. Boards must be bonded edge-to-edge, flush in one plane, in a staggered pattern, avoiding aligned vertical joints. Joint width should not exceed 2 mm;

Perimeter-and-strip — wall surface irregularities up to 5 mm: the mortar is applied to the EPS board surface as strips 20 mm from the edge along the whole perimeter of the board, then in the middle. The perimeter strips should have gaps so air pockets don't form when bonding the boards;

Dot-and-dab — wall surface irregularities up to 15 mm: the mortar is applied to the board surface 20 mm from the edge along the whole perimeter as strips 60 mm wide and 20 mm high, then in the middle of the board as dabs, at a rate of 5-8 dabs about 100 mm in diameter and 20 mm high per board sized 0.5x1 m. The perimeter strips should have gaps.

Mechanical fixing of boards

Mechanical fixing of boards begins after 3-4 days, before applying the protective reinforced layer. The board is additionally secured with special dowels. Dowels are installed at joint intersections and additionally over the board surface: for a board size of 0.5x0.5 m use 4 dowels, for 1x0.5 m — 5 dowels.

Applying the protective layer

The mortar is applied in a thin layer up to 2 mm over the mineral wool or EPS boards. A reinforcing mesh is then embedded into it and smoothed. At corners, the mesh should overlap by at least 5 cm. A second layer of EcoTerm mortar, 2-3 mm thick, is applied over the mesh. Under normal conditions, decorative protective coating should be applied no sooner than 2-3 days after installing the reinforced protective layer. Prime the reinforced protective layer with ProTec primer for smooth surfaces, let it dry fully (about 6 hours), then apply DecoPlast decorative plaster followed by painting.

Work should be carried out at a substrate temperature between +5°C and +30°C. All recommendations above are valid at a temperature of +20°C and relative humidity of 60%. Under other conditions, the open, setting and hardening time of the mortar may change. EcoTerm contains cement, and hydration causes an alkaline reaction, so eyes and skin must be protected when working with it. If the mortar gets into the eyes, rinse immediately with water and seek medical help.