K
Kirchland® IsoHold adhesive mix

IsoHold adhesive mix

IsoHold mix is used to fix mineral wool or EPS boards when insulating facades of brick, concrete, aerated concrete, limestone, etc. buildings.

Technical data

CompositionPolymer-cement mix with mineral fillers and additives.
Mortar consumptionfor installing EPS boards - 4-4.5 kg per 1 m²; for installing mineral wool boards - 4.5-5 kg per 1 m²
Mix ratio4.5-5 L of water per 25 kg of dry mix.
Pot life of the mixed mortarup to 2 hours.
Service temperature-50°C to +70°C.
Substrate temperature+5°C to +30°C.
Frost resistance, not less than50 cycles.
Adhesion (bond strength), MPa1 MPa.
StorageIn the manufacturer's sealed original packaging, in dry rooms on wooden pallets, 12 months from the production date indicated on the packaging.
PackagingBag, 25 kg.

Application

Mix the dry compound with clean water (temperature +15°C to +20°C) at a ratio of 0.18-0.2 L of water per 1 kg of dry mix and stir with a drill and mixing paddle until a smooth, lump-free mass is obtained. Let the mortar rest for 5 minutes, then stir again. The mortar can be used for up to 2 hours.

Bonding mineral wool boards

Before applying the adhesive to a mineral wool board, first work it into the board's fibres. The mortar is applied over the whole area of the board with a 10×10 mm notched trowel. After applying the mortar, the board must be placed immediately in its designed position and pressed in. Boards must be bonded edge-to-edge, flush in one plane, in a staggered (brick-bond) pattern, avoiding aligned vertical joints. Remove mortar residue with water before it sets.

The bonding method for EPS boards is chosen depending on the condition of the facade surface:

Full-surface — wall surface irregularities up to 3.0 mm: the mortar is applied over the whole surface of the board with a 10×10 mm notched trowel. After applying the mortar, the board must be placed immediately in its designed position and pressed in. Boards must be bonded edge-to-edge, flush in one plane, in a staggered pattern, avoiding aligned vertical joints.

Perimeter-and-strip — wall surface irregularities up to 5.0 mm: the mortar is applied to the EPS board surface as strips 20 mm from the edge along the whole perimeter of the board, then in the middle. The perimeter strips should have gaps so air pockets don't form when bonding the boards. Mortar coverage must be at least 40% of the insulation board's area.

Mechanical fixing of boards

Mechanical fixing of boards begins after 3-4 days, before applying the protective reinforced layer. The board is additionally secured with special dowels. Dowels are installed at joint intersections and additionally over the board surface; for an insulation board sized 1.0×0.5 m, use 5-7 dowels.